Hi,
I just placed my pre-order for the Hot Toys 1/6th Tron Legacy Sam Flynn with Light Cycle yesterday. This is my first time ordering from Sideshow, so I wasn't sure how to sign up for the Flexpay option. It doesn't show up in my order that I have it, so I'm guessing I might have done it wrong. Is there a way Sideshow can switch my order over to the Flexpay option?
Thank you!
-Chris
I just placed my pre-order for the Hot Toys 1/6th Tron Legacy Sam Flynn with Light Cycle yesterday. This is my first time ordering from Sideshow, so I wasn't sure how to sign up for the Flexpay option. It doesn't show up in my order that I have it, so I'm guessing I might have done it wrong. Is there a way Sideshow can switch my order over to the Flexpay option?
Thank you!
-Chris